Hello Gurus,
I am doing payroll, and the request is to budget by job position. I have in rows, Job Position, Building and Cost Center. My Cost Center depends on my Company Code, wich is selected on the Context, the Building wich is expand in rows and the position which also is expand in rows.
The Cost Center is composed= Company Code + Building + job Position.
I create a Local Member to concatenate those dimensions, I pretend to override the Cost Center expanded by row for the Local Member calculated by Row.
I wonder if it is possible.
I don't set an attribute to the Position named Cost Center because it may change when I change the building to budget.

As you can see in the image, the Job Position change. In this case Im planning for building JXIR but the building can be selected in context. LCECO is my Local Member where I want to set as Cost Center. I used epmdimensionoverride in the column where is say OverCeco. But it doesn't work.
how could I make Dynamic the cost Center if i have to Plan by Job Position.
Any idea?
Best Regards.