I have a product which has a manufacturing BOM. Now there is a running change in this product. Some child parts will be replaced by new one.

Since it is a running change, old parts will be used till stock is consumed and all new ordering to sub contractors should be as per the new BOM.

If we change the BOM with new child parts then old part will not be consumed and if we do not change the BOM then with each MRP run system will generate shortages of old parts to vendor.

Please help me out on this.

SUNIL VERMA

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Jul 20, 2016 at 12:17 PM

    Hello

    On tab MRP4 of the material master you can define a follow-up material and then a date for the discontinuation.

    BR
    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 20, 2016 at 12:24 PM

    Hi Sunil

    Please go through the below link to achieve your requirement.

    Basics of using discontinuation data

    Regards

    Suresh.M

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.