Skip to Content
0
Jul 19, 2016 at 04:41 PM

Consumption material relevant during Cost Estimation

83 Views

Hi Expert

I need to find a solution to Costing (when I run CK11n) material defined as Consumption material (MARC-SCHGT='X').

In Production I want manage these components just as information because they are consumed when a box of them is transferred to the Workshop using a 201 (Cost Center consumption) movement type. Setting the flag MARC-SCHGT I can solve the logistic issues, but these material are not considered when I run Cost Estimation using CK11n or similar. Is there a solution for this request ?

Thanks for your help.

Claudio Carrara