Hi all,

I need to upload maintenance plan of 4-5 different plants, I found that for each equipment plan detail are same in all plants, like Inverter is there in all plants and cycle is same and start date is same. So ,can anybody let me know, is there any consequences or any future consequences, if I create a single plan for all the items of different plan whose plan parameter is same.

Hope my question is clear.

Thanks

Vivek Varun

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 19, 2016 at 01:45 PM

    Vivek Varun,

    If you are using shift factors, then you might find that sites find there plan dates changing due to another sites maintenance being early or late.

    Other than that, it should be OK.

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.