Hello everyone,
During costing run (CK40N), the "marked as deleted" and "cancelled" materials show up with these error messages:
"MG 144 The field MBEW-HKMAT is defined as a required filed; it does not contain an entry"
and
"CK 565 Costing view for material 2014 in plant 1100 could not be created"
We would like to avoid the error numbers regarding that type of materials (Mark as deleted and cancelled).
If it is possible, could you please tell me how to exclude those errors from log?
Thank you