Real time scenario:

Currently 2 type are sales order used for a site and one sales order has ATP check with combination ZH & A for the scope of check is sales requirement, deliveries are checked and other sales order is a rush order which has different availability check combination Z9 & B for this manually in material master the availability check has been changed.

New Requirement:

Now the requirement is that rush order requirement should be confirmed by lead-time and currently, the stock has been blocked for normal sales order and lead time will be varied from 1 to 150 days and currently for 150 days stock is also blocked but now the stock should be reserved only for 60 days and remaining lead days stock should be considered as a free stock.

For example scenario: Stock:100 Pieces Sales order till 31.12.2016: 150 pieces Sales order lead time within 60 days = 30 pieces. Now the stock should be considered for ATP check = 100 - 30 = 70 pieces Now for Rush order 70 pieces should be considered and currently whole 100 pieces are consumed and in ATP it showing as Zero but now with the new requirement with lead time 60 days stock alone should consider for ATP check.

Please give your suggestion with lead time is there any way can we able to do any enhancement for ATP check.