IA02 - change plant

Hi masters

Please, I need to change the planning plant in all equipments tasks lists (like a mass processing SHDB using IA02 transaction), but the field is locked, is there any other way to do it ? or to unlock the field ?

Is there any mass processing to change it ?

Capturar.PNG (24.9 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 18, 2016 at 03:09 PM

    Greetings Michel,

    I'm fairly sure it can't be done, unless you program some specific report.

    The Planning Plant for an Equipment Task List is determined from the Equipment master record when you create the Task List, but it's not updated.

    I understand that you have now moved some Equipments from Plant ONE to Plant TWO. Therefore, I expect you have now changed the Planning Plant for them to TWO in IE02 (via a mass update /LSMW).

    What I propose you do is that you copy the Task Lists for the Equipments into new Task Lists for the same Equipment using LSMW (recording of IA01) - this will allow you to create new Task Lsits in the current Planning Plant. Afterwards update your Maintenance Items and archive the obsolete Task Lits in IA25.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.