Hello Experts,

I am working with follow up function while entering usage decision in Inspection lot.

My inspection lot is for Inspection/calibration of PM equipment. My follow up action contains the FM for status change of equipment. I have assigned this follow up action to all the codes of the selected set for my UD's (acceptance as well as rejection codes).

When I give UD as any of the rejection codes and save, the equipment status becomes NPRT in background. So far so good.

Now , my requirement is that if I do another calibration work order/Inspection lot, and this time if it passes, then system should remove the status NPRT.This is not happening. During saving of the QA11, the pop-up comes asking if the status should be changed. I enter accordingly but still the status does not change. The equipment still has NPRT on it.

What could be missing?

I know that I can remove the NPRT from the equipment master from IE02 manually, from the PRT data tab but that is not my client's requirement. Please advise.