SAP PP RLT Calculations for In house produced material

162 Views

Dear experts,

I want to do RLT (Replenishment lead time) calculations for materials (Procurement type E) where

1> In house production time (MRP2) not maintained

2> Planned Delivery time (MRP2) not maintained

3> Total RLT (MRP3) not maintained.

4> Only maintained is routing where we have operations for which required timings are maintained.

And finally we are doing availability check @ production with RLT

So my question is, In this scenario, how system will calculate RLT? It will be zero or it will be sum of timings required @ all operations.

Thanks and Regards,

AK