Dear experts,
I want to do RLT (Replenishment lead time) calculations for materials (Procurement type E) where
1> In house production time (MRP2) not maintained
2> Planned Delivery time (MRP2) not maintained
3> Total RLT (MRP3) not maintained.
4> Only maintained is routing where we have operations for which required timings are maintained.
And finally we are doing availability check @ production with RLT
So my question is, In this scenario, how system will calculate RLT? It will be zero or it will be sum of timings required @ all operations.
Thanks and Regards,