Skip to Content
0
Jul 12, 2016 at 08:12 PM

REM Mfg Availability Check MDVP

139 Views

Hi,

I have a planned order for 150 nos.

When i execute Collective Availability Check (Missing Part List) in MDVP, for a particular BOM Item, System is showing Committed Qty as "0" and Required Qty as "150".

But the stock available is 200 nos. Then Why system is showing above result.

Note: Storage Location is Excluded in MRP RUN.

Regards,

Dinesh V.