Skip to Content
0
Jul 07, 2016 at 03:55 PM

Business Function / Switch

135 Views

Hi, I'm needing to install HANA-Optimized Content for CO and I noticed two switches. One for Controlling and one for Controlling (Basis).

Anyone know what the difference is and whether I need to set the switch for the Basis one?

Thanks!

/IMO/RS_BCT_IMO_CO

BW: in-memory optimized Content CO (Controlling)

/IMO/RS_BCT_IMO_CO_B

BW: in-memory optimized Content CO (Controlling) (Basis)