BOM is not exploading correctly

25 Views


Hi Experts!

In my finished product process order, Bom is not exploded as per the explosion date. Actually i have checked below things before posting here. Please guide me if i missed anything:

I have a Finished product whose validity from Jan, 2015 and this has a assembly whose BOM component is changed on 5/23/2016 with change number whose validity starts from 06/06/2016 to 12/12/9999.Means component new change is valid from 06/06/2016 with new change number.

Process order has been created on 03/06/2016 from planned order by putting the order convertin indicator in APO PPDS and old bom must be exploded at the time of order creation as new changes will be only from 06/06/2016.

When i checked the process order, BOM explosion date is 13/06/2016(some one must be changed - no idea how to track it) so process should have the latest bom as components, but still i can see old bom components in material overview tab

.

Thanks,

ASM