Hi,

I have created copy operator in development environment of IBP and want to move it to production system.

What i need to do in that case?

I know i can directly create copy operator in Production and can add in the planning area and details but organization want it to transport from Dev-->QA-->Prod.

Do i need to transport the entire model or I can only transport the newly configured copy operator.

Thanks,

NC

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jul 01, 2016 at 11:05 AM

    Hi NC,

    Planning operators are transported along with the planning area, so you would need to transport your PA.

    Regards

    Alecsandra

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.