Setting up status automatically with allocation of resource in MRS

Dear MRS experts,

Need a guidance over the Abstract status setting in MRS. The requirement is to set an status, say RES_ALLOCATED automatically , once the resource has ben allocated to an operation, into MRS planning board . I don't need to set it manually for each operation. Its should be set immediately once a resource is assigned to an PM order demand operation.

Can someone guide here how to achieve this??

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jun 29, 2016 at 08:18 AM

    If you are talking about User Status, you need to use fm STATUS_CHNAGE_EXTERN in the user-exit IWO10009. Here in this exit you will write the coding so that when your conditions are satisfied the user-status of your choice will be set using the above fm at the time of Order save.

    Ignore the above if it is not relevant to MRS situation.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.