Do you want to default the Work schedule based on the position from It 1? If yes, change the feature attributes. Click on the Attributes radio button in PE03, the click on the Struct button at the bottom. Here the structure name is assigned which controls which decision fields can be used in the feature. If you assign P0001 here, you will be able to use Position as a decision field.
Add a comment