MRP _Monthly lot size with back dated orders

Team,

As per the below details, i have SO for May and June.

I have selected monthly lot size, but system is creating two planned orders for juy two different planned orders

in this case, i need if there are two different planned order in back dated, then sytem should club that two to one planned order and for the future , it is only monthly basis as below..how to configure it?

pastedImage_2.png (17.6 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Jun 28, 2016 at 01:04 PM

    Hello

    You can allow the start in the pas for planned orders in transaction OPPQ, however, requirements in the same month will be covered by a single planned order.

    BR
    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 28, 2016 at 05:06 PM

    Vijesh,

    For the same situation if you change the planning date as 30th June in MD03, does the output change?

    Best Regards,

    Rajen

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.