Skip to Content
author's profile photo Former Member
Former Member

Can BOBJ replace BW when ECC moves on HANA

Hi

I plan to move my company's ECC server on SAP Hana database and use BIP/BOBJ 4.2 for reporting.

By using this strategy can i get rid of BW system and use BIP/BOBJ 4.2 system replace BW for reporting purpose.

Regards

Tushar

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jun 29, 2016 at 02:55 AM

    Hi Tushar,

    (I'm assuming you're asking if that's a good idea or if its possible to do that)

    Some very simplified BW scenarios can surely be ported to Suite on HANA.

    BW scenarios with stronger complexity (harmonization between many system types and layers) will definitely require a thorough project in order to analyze the impact or such change.

    However, I think the first question is: why do you need to 'get rid' of BW?

    I suggest you to start off reading SAP HANA Live versus SAP BW (powered by HANA): When to choose what?

    As well as https://blogs.saphana.com/2015/07/06/sap-hana-replace-bw-hint-no/.

    BRs,

    Lucas de Oliveira

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.