on 06-20-2016 9:12 AM
Hello,
I am using the Design Studio Version 1.6 (Version: 16.0.5). I created two Reports which I connected with the Report Report Interface (rsbbs). When I am jumping (Springen zu) from Report 1 to Report 2 with clicking on Value 2 on report 1 and I got Value 4 on report 2. The issue is, that (how you can see on graphic 3) on report 1 the first jumping point is not Value 1, it is Characteristic. I want that Value 1 jumps to Value 1 and so on. How can I solve that?
Thank you in advance,
Jochen
Could you try the same RRI in Analysis Office or BEx Analyzer? If it works in those tools, then it is something specific to Design Studio; if works the same as Design Studio, then it is something with the way RRI is set up in RSBBS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
81 | |
25 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.