Skip to Content
0
Former Member
Jun 19, 2016 at 11:47 PM

Assigning a Time Wage Type to a Work Schedule

260 Views

Dear Experts;

I need your cooperation in something related to the time evaluation. I need to configure an overtime to start calculating the hours after 5:00 a.m. and multiply the rate by 1.35.

How can I assign that wage type to the work schedule and how can I set the conditions in table V_T510S

Weekdays PH pre.day PH cur.day PH sub.day Val.class DWS class Day type

As I can see at that customer he has different time wage types with different conditions, so how can I set my condition based on a specific work schedule.

Thanks in advance.

Best Regards;

Lobna