on 06-16-2016 9:52 AM
Hello All
We have number in time evaluation fort time wage types and that is available in ZL (XT00)
We want to multiply the number and WT-700 Amount (Basic Pay IT)
Please let me know how to pick.
Also please let me know whether can we use Time wage type in -ve Time management?
Reg
SK
Are you sure w/t 0700 contains the rate in the amt field? Any way, if you want to valuate the current time w/t using the amt in w/t 0700, follwing line can be used, provided (a)you have already checked the w/t or (b) the pcr's ESG/W/T is for this w/t.
AMT= 0700 (note there are 2 blanks after "AMT=")
MULTI ANA
ADDWT *
Notes:
Time evaluation (txn PT60 with -ve or +ve time mgt):
A w/t is known as a time w/t if it is generated here. Any w/t can be generated here, using (a)T510S and function GWT or (b)with ADDZL op'n in a PCR (usually based on eligibility rules). The pcr may be called with PTIP, RTIP, ACTIO, etc.
Function PZL processes the ZL table w/t entries with a PCR. If the processing of a w/t does not end with ADDZL, then the w/t is dropped from ZL.
Payroll:
Sub-schema XT00:
function XLIT: It imports Time w/t's to payroll into the table IT. .
PCR X015: This is used normally to valuate time w/t's. By this time, the val.bases would have been already created in pcr X010 & then the hourly rate calculated in pcr X013.
It is possible that a time w/t is valuated in a different standard or customized PCR depending on the business needs/rules.
PCR X020: Adds/cumulates time w/t's to RT & CRT based on a w/t's proc cl 03.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.