MRP for group of products

former_member503200
Participant
0 Kudos

I know I can run MRP for multiple products with product group,but the problem is our product group changes day to day depending upon the requirement.

Is there any way, I can run the MRP for multiple products, without creating a product group.

thx

Jeff

Accepted Solutions (0)

Answers (2)

Answers (2)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

This can be possible with user exit - M61X0001 Material Requirements Planning / User Exit for Selecting Materials in the Planning Run.

Refer this useful documents on it.

Best Regards,

R.Brahmankar

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Upgrade to MRP on HANA and use transaction MD01N, where you can choose any desired selection criteria

BR
Caetano

ameya_beri
Active Contributor
0 Kudos

Hello Jeff,

You can write your own logic to have MRP plan specific materials or a group of materials, based on any parameter in material master.

Below links have examples on how people have had same queries in past,

MRP Run per MRP controller | SCN

Best Regards,

Ameya Beri