demand based MRP

21 Views

Hi all,

I have a requirement. I need an MRP type that it will trigger PR's only based on reservations (if any exists) with the quantity of the reservation.

So lets say, I have a material with zero stock and a reservation for 3EA is created, then I want through MRP a PR for 3EA.

Is this possible?

BR