Skip to Content
0
Jun 04, 2016 at 06:16 PM

In-process lot inspection at order release

1260 Views

Hi,

Why the system automatically generates in-process lot inspections if there's no MIC assigned at any phase at the recipe?

Of course, the material has assigned the 03 Inspection type at the material master but if there's no MIC assigned at any phase a lot inspection shouldn't be created. At least this was the behaivour of the system before.

Thanks.

Best Regards

OCS