Partially GR/Posting with UD against Inspection Lot

former_member198012
Participant
0 Kudos

Dear Friends

i have two question please advise me

1) if partially GR/Posting is made against lot

  for instance inspection lot qty is 100 and user post only 50 qty and Taken UD

then how will remaining qty will be posted?

2) how to restrict user , can't take UD until remaining qty posted ?

Accepted Solutions (1)

Accepted Solutions (1)

former_member193808
Active Contributor
0 Kudos

Hi,

1. You can go to QA12 (Edit UD) and post the remaining quantity whenever you need. The inspection lot status will remain SPRQ (Stock posting required) till then. Once all the quantities are released, then status will change to SPCO (Stock posting completed).

2. This requires customization. There's no standard control on inventory level and UD. Please check with ABAP team to place custom controls at UD level.

Thanks

Prem

Answers (2)

Answers (2)

former_member198012
Participant
0 Kudos

Thanks All

remaining qty will be posted through QA12 ! but no restrictions for users

former_member185453
Active Participant
0 Kudos

Hi,

Please check these.

Outstanding quantity PO report | SCN

Regards;

S Ahmed