Dear all,

While creating production order from planned order with MD04, the routing is not available whereas the routing could be seen in orders released through CO01. Can you suggest what could be the possible reasons for this.

Additional data:

With MD04, the order quantity is coming as 9 square inches. But in actual the production unit is set as UNIT in the work scheduling tab of material master. The base unit is Square inches.

Could the problem be related to lot size in routing of the part or the maximum and minimum lot of the part set in material master in MRP 1.