What is the role of responsible cost center in an order & how is it useful?

Former Member
0 Kudos

In an order in additional data tab there is a field called responsible cost center, can anybody tell me in what way is it useful in an order?

Accepted Solutions (1)

Accepted Solutions (1)

jogeswararao_kavala
Active Contributor
0 Kudos

Harsh


You might be knowing that in Work Order:

  • The Cost center in Locations tab and in Settlement rule is from the Equipment(or FLocn) masterdata.
  • The Responsible cost center in the Addldata tab is from the Main Work center masterdata.


Now go through the posts below:

Post by Maria

Technical Object Cost Center and Work Center Cost center


Few discussions

Cost Flow is Work Order - Responsible Cost Center

Responsible cost center vs account assignment cost center

what is responsible cost center in work order

Regards

KJogeswaraRao

Former Member
0 Kudos

thank u very much JRK sir for sharing the info, thank u very much