Hi experts,
could you help me with this error in VF02?
Message no. KE349
In Profitability Analysis (CO-PA), the system tried to valuate a line item using the future standard cost estimate.
In order to determine the future plan period, the system needs to read the valuation segment of the material master.
The system has found that the future plan period is not filled for product "8T3ZGFC2ZZZZ18" in plant "HL01".
Display material (View: Costing)
The system looked for the material cost estimate using costing key "Z02", as defined in the Customizing settings for CO-PA.
The document cannot be processed.
Contact your system administrator.
"
KE4J
Way this error exist? What should I do? Do You have anybody idea?
Thanks