Hi experts,
could you help me with this error in VF02?
Message no. KE349
In Profitability Analysis (CO-PA), the system tried to valuate a line item using the future standard cost estimate.
In order to determine the future plan period, the system needs to read the valuation segment of the material master.
The system has found that the future plan period is not filled for product "8T3ZGFC2ZZZZ18" in plant "HL01".
Display material (View: Costing)
The system looked for the material cost estimate using costing key "Z02", as defined in the Customizing settings for CO-PA.
The document cannot be processed.
Contact your system administrator.
"
KE4J
Way this error exist? What should I do? Do You have anybody idea?
Thanks
Hello,
You can check in KE4J for the costing key Z02, if in access standard cost estimate for costing key Z02 the period indicator is "future standard cost estimate according to material master".
Seems in MM03 there is no future standard cost estimate exists for material 8T3ZGFC2ZZZZ18 in plant HL01.
Regards,
David
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.