Skip to Content
author's profile photo Former Member
Former Member

Requirement Urgency (PRIO_URG) field mandatory for PM

Hi,

I've activated the requirement urgency field as mandatory for all purchase requisitions but when the user creates a PR from Plant Maintenance this field is not required and he can save the PR.

Is there a way to put the Requirement Urgency field as mandatory even when the pr is created from PM (t-code IW32 or IW31)?

Regards

shoaib

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on May 02, 2016 at 11:32 AM

    Hi Shoaib,

    I think it is possible. Just check with ABAP for follwing FM's

    PM_PRIO_REQ_DETERMINE

    GET_URGENCY_FROM_PURGPM

    Regards,

    Amol

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.