SAP Network Activity Elements scheduling with different work ceters

Feb 07, 2017 at 05:37 PM

45

avatar image
Former Member

In ETO scenario, our requirement is to add Activity Elements to the parent Internal activity for breaking down the Internal activity into sub-tasks and do the scheduling at Activity Element level in a sequence.

However ,I am aware that scheduling is not possible at Activity Elements and Activity Elements will inherit Parent Activity scheduled dates.

Is there a way to initiate a sequential scheduling at the Activity Element level?

For Example,

Internal Activity-Power Plant onsite Engineers (Start Date: Feb 1-End Date: March 25)

Activity Element1:Initiation(Feb 1-Feb10)

Activity Element2: Drawings(Feb11-March10)

Activity Element3: Kick Offs(Feb 11-March25)

Can we use an offset to the start or finish of the activity to specify the start/finish of the activity element?