Maintenance Plan schedulling issue

Hi PM Guru,

I have a scheduling question.

Please have a look at the setting in Task list and strategy, the packages are of the same hierarchy.

When scheduling, the 1Y is separate from the 1M/2M/4M.

I expect they are the operations are in the same order.

Please get me corrected.

Thank you so much,


Sally

Capture.PNG (16.4 kB)
Capture2.PNG (98.4 kB)
Capture3.PNG (67.2 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Apr 26, 2016 at 07:23 AM

    Hi All,

    I have it answered by myself.

    In the Strategy setup, I need to ensure the Unit is unique within one strategy or else it generates separeate orders even though the multi packages are due at the same time.

    Thank you.

    Sally

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Apr 26, 2016 at 04:14 AM

    Hi Sally,

    What is the scheduling Indicator ? Is it Time or Time - Key date

    Is there only one Maintenance Item or Many Items

    Regards

    Terence

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.