on 04-12-2016 10:05 PM
Hi Gurus,
I have this scenario:
1. There is a project (SAP - PS) with row materials in Project Stock.
2. We create a Production Order, and comsume row materiales from Project Stock.
3. Production Order delivers a Finished Product in Project Stock.
I would like to know if Material Ledger can calculate Actual Cost by Plant + Project Stock + Finished Product?
Is there a standar scenario to this casuistic?
Thanks in advance.
José Luis
Hi Jose
Yes. This is covered in standard solution itself.
It should work
Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ajay,
Thank you for your response.
Then, I understand that:
1. The same Finished Good (3S), in the same Plant, in different Project Stock, I would have different actual cost.
I would like to know if is possible calculate Standard cost by Plant + Project Stock and Material.
Thanks in advance for your help.
Atte.
José Luis
Hi Jose
So far I understand for any material you can have a one standard cost across system and you can't get different standard cost at diff application area like PS level etc..
Kamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.