Set BOM creation from Engineering BOM

former_member1269942
Contributor
0 Kudos

Hello Guys,

I have a engineering BOM from which i will create a production BOM. Engineering BOM structure is very flat and simple but production BOM is complicated.

For e.g.

Engg BOM have component - 1,2,3,4,5,6,7 & 8

but in Production BOM depends on Machine configuration i need to create a Set - 1,2,4,5, - one set & rest - 3,6,7,8 i will buy loose.

The set BOM may change as per the machine configuration. BOM level is 3rd level of main machine.

I tried Classification with Subcontracting - its working creation a SET BOM but not able to generate the requirement for loose component as they are not get selected by classification in subcontracting.

Let me know if there is a way to manage this scenario.

Thanks

SD

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

What do you mean by "I will buy loose"? and what is not happening for you? is your BoM not formed proper or is the requirement not being generated for some items?

Thanks,

Madhu