on 04-07-2016 6:12 PM
Hello community,
I´m trying to release order but the realease was rejected.
Logs
A brief explanation what I already did:
-Spro-production->Shop Floor Control->Define production scheduling profile
The automatic batch creation in the order = 2 (Autom. batch creation at order release)
-In mm02->tab MRP2
Batch entry=3
-COB1
I define the selection criteria and sort
Thank you for reading, any tip?
Best regards,
Bruno Tiago
Hi Bruno,
This could happen for several reasons:
- Maybe you don´t have batches for these components.. check in MB52 (including batches) if you have batches for these components.
- Maybe the problem is that your components does not have the classification view, then the batches of these components will not have the classification view. Check the batches in MSC3N and ensure you have the classification view.
Once you ensure there previous points are not a problem, try to run a batch determination manually in CO02.
Kind Regards,
Mariano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Bruno,
Please find below explanation it will be useful.
1)You don't have stock so batches are not available.
2)If you have stock but don't have batch wise so clear available stock.
3) Stock up or purchase raw materials with respect to batches.
4)Convert planned order into production while releasing batch will pick automatically.
If you are testing just go to MB1C stock up through 561 or 501 moment type
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.