Skip to Content
0
Former Member
Apr 05, 2016 at 07:53 PM

Profit Centre field mandatory in Material Master Costing Tab

471 Views

Hello All Experts,

I want to make Profit Centre field mandatory for Costing Tab 1 in material master. I did it via Field Group Number 48 and it worked like charm.

But when a person creating view for "Sales General /Plant" view it still mandatory there too ? How can I avoid that ? I just want to make it REQUIRED for Costing Tab 1 !

I did some basic study and found out that profit centre field technical details are MARC-PRCTR whether it is on Sales view or Costing view so I think it refers to same technical value material master wide.

Not sure if Validation is possible on material masters in MM area even if it is available it will again look for MARC-PRCTR right ?

Is there any possibility I can avoid this views criteria ?


Guidance will be helpful on this.





Regards,

Charu.