Skip to Content
0
Apr 05, 2016 at 01:17 PM

SAP BW 7.01 EHP1 can be connected to SAP ECC 6.0 on Hana SPS11?

36 Views

SAP BW 7.01 EHP1 can be connected to SAP ECC 6.0 on Hana SPS11?

We are migrating a SAP 4.7 (ERP) to SAP ECC 6.0 on Hana SPS11, but we didn't want to migrate the SAP BW 7.01 SPS6 EHP1 at this time.

Can we keep the version of BW mentioned before without problems? If not, what is the version that should migrate the BW to connect to ECC 6.0 on Hana SPS11?

Thanks a lot!