Skip to Content
0
Apr 05, 2016 at 08:17 AM

Equipment LSMW (IBIP-0400) is too slow in Quality

121 Views

Hello Experts,

I am using LSMW to create equipments,

Object 0400 Equipment

Method 0001 Create BI

Program Name IBIP

Program Type B Batch Input

Number range is internal.

But the problem is in Development processing is too fast and in quality system, it is too slow.

I checked with basis team , they said, in quality system, resources are 4 times more than in development.

so from that side no issue.

I tried to trace the equipment creation using ST05. I just tried with 10 records.

In development it took 3 sec and in quality 17 secs.

i found one difference in trace. In the quality system, the table NRIV is being hit and it is taking maximum time

but in development it was not hit. I am confused.

PFB the screen shot from Quality trace.

If anyone has faced such issue please help.

Regards:

Ashish T.

Attachments

NRIV HIT.jpg (177.6 kB)