Testing of "Availability Check Control" OPJJ

Hi,

Our client asked us to is remove the checkmark for “Incl. Dependent Requirements” in configuration of "Availability Check Control" OPJJ( Availability Check +Checking Rule),

I had removed the configuration as requested by client.

I want to know the exact impact of this configuration change and i would like to do testing to know what has changed after removal of check mark for "Incl of Dependent Requirements".

Appreciate if any expert give me some suggestions/inputs to do testing of this config change.

Thanks in advance.

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Apr 03, 2016 at 06:01 PM

    Aditya,

    Dependent requirements are those requirements that are generated from a planned order. The planned order is against the parent material in the BOM, the Dependent requirements that are generated for this planned order are for the child materials in the BOM.

    When you perform an availability check, you have the option of considering (or not considering) these dependent requirements when you are asking the system to calculate the ATP quantity.

    For testing, I think the method is obvious. Set up a test scenario where there are dependent requirements. Ensure that the ATP quantity that is calculated during Availability reflects the fact that the dependent requirements are being ignored.

    If I were the project manager for a project, and it became evident that the client had instructed one of the consultants to change a configuration, and it was also evident that the consultant did not understand the impact of the change, I would find that very troubling. Those are usually symptoms of a project that is falling out of control; the wrong people are responsible for the wrong project tasks. Clients who are technically competent, or worse, who THINK they are technically competent, can be very difficult to manage.

    If I were you, I would ensure that the change that was requested is properly documented, and that the project manager is given the opportunity to determine if the change is within the scope of the project/contract.

    Best Regards,

    DB49

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 04, 2016 at 05:46 AM

    Hi,

    Appreciate if some one provide more inputs to my query.

    Thanks in advance.

    Add comment
    10|10000 characters needed characters exceeded

    • Hello

      Availability check calculates ATP quantity which uses Total requirement , Issues, Receipt and Stock

      Removing dependent requirement will not consider the dependent requirement created for that material against for any other demand.

      Regards,

      Velmurugan S