Hi all SD Experts!

The scenario

SD consultants designed the batch split determination on a date-value in batch classification to manage a FIFO-like procedure.

This seems to be working well...until now.

The "wrong" case:


In a delivery I merge 2 different Sales Order, single item, the material is the same MAT0001, so my Delivery got

ItemMaterialQty10MAT00015010MAT000180

For this material, as Stock level, I got 2 batches

BatchMaterialQtyDate on classificationBATCH1MAT00015020.03.2016BATCH2MAT00019029.03.2016

Before doing the good issue, I make the automatic batch split in VL02N and I got this result

ItemMaterialBatchQty10MAT00015090001MAT0001BATCH15020MAT00018090002MAT0001BATCH15090003MAT0001BATCH230

Obviously, when I post the good issue, I got an error since i'm trying to consume 100 from BATCH1

It's not a big problem at the moment since we do not have, yet, an automatic procedure for GI so we can check and fix manually
But we are planning to automatize a bunch of stuff, GI too


So I want to prevent the problem.

I looked for OSS Notes and on SCN (btw, we do not have any userexit implemented on batch split and batch determination) without success and I'm a bit out of my element.

Is this a normal behaviour (I can see that for SAP BATCH1 is not "consumed" yet ) or there is something i'm missing?

Thanks!

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

3 Answers

  • Apr 01, 2016 at 03:52 PM
    when I post the good issue, I got an error since i'm trying to consume 100 from BATCH1

    What is the error message system was popping up ?

    G. Lakshmipathi

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 01, 2016 at 06:08 PM

    Hi Simone

    what is the fix you are looking at ,

    CASE-1

    1. Batch should not split and only one Batch should be delivered ?

    ItemMaterialBatchQty10MAT00015090001MAT0001BATCH15020MAT00018090002MAT0001BATCH280

    with the above scenario , You would not be able to do delivery if following scenario

    MAT0001 ;

    BATCH1- 50

    BATCH2- 50

    SO & Delivery - 100

    Item 10 - 60

    Item 20- 40

    with the above example system should ignore this batch in delivery , is that you are looking for ?

    CASE -2

    System should block the stock on FIFO basis for Delivery line item and from your example Item 20 should not take Batch-1

    Regards,

    Santosh

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 05, 2016 at 03:56 AM

    Hi,

    Do below steps:

    1) Check if your ATP strategy used by your material (OVZ9) does "Include deliveries", it must be ticked

    2) Make sure ATP check is not turned off for your delivery item category (V_TVLP_V-VERPR)

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Simone Milesi

      Hi,

      That's weird, because I tested in my system the batch split does consider remaining ATP.

      Tried same sample like yours, BATCH1 no longer selected by item 20 after consumed by item 10.

      The other part I can think of are:

      1) OVZ2 config

      2) Depends on which value assigned in V_TVEPZ_V-BEDHK, have to look at the config accordingly