Skip to Content
author's profile photo Former Member
Former Member

How activated change pointer for inspection lot ?

Hi Experts,

My requirement is to create program who run every 30 minutes to catch modification or creation of inspection lot to finally send iDoc

I have try to activate change pointer for inspection lot (QALS in field KTEXTLOS for example) via tcode BD60/BD50/BD52 for a specific message type but I don't find any entries in tables BDCP/BDCPS when I make a modification of the description of an inspection lot in QA02.

Plus I would like to catch creation of inspection lot too and change pointer doesn't log entries in my table for creation.

What is the good process to used this change pointer in my case ?

Thanks

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jul 21, 2020 at 03:36 PM

    I face exactly the same trouble, if anyone has an answer ?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.