Hi,

I have the following requirement from client:

Material is coming in the container to the warehouse gate. Material is received directly on pallets and then sent to Bins. Here my Client is doing logical GR in the system for per pallet quantity which he wants to place on the pallet.

After that TR is generated and TO is created. While placing the material in bin client is following the given logic which is mentioned below

My client is having the double dip (two pallets in one bin where one pallet is kept inside and other is kept outer side in the bin) strategy for the material placement (Putaway) which is given as below

Example:

I have 4 quants in bin 1 L1-A1, L1-A2, L1-A3, L1-A4

I have 4 quants in bin 2 L1-A7, L1-A8, L1-A9, L1-A10

I have 4 quants in bin 3 L1-A11, L1-A12, L1-A13, L1-A14

Where L is level and A is the sequence where the pallet is stored

Wall of Warehouse


A1

R1

L1-A1

L1-A3

L1-A5

L1-A7

L1-A9

L1-A11

L1-A13

L1-A15

L1-A17

L1-A2

L1-A4

L1-A6

L1-A8

L1-A10

L1-A12

L1-A14

L1-A16

L1-A18

Empty space for moving fork Lifts


A1

R2

L1-A2

L1-A4

L1-A6

L1-A8

L1-A10

L1-A12

L1-A14

L1-A16

L1-A18

L1-A1

L1-A3

L1-A5

L1-A7

L1-A9

L1-A11

L1-A13

L1-A15

L1-A17

A2

R1

L1-A1

L1-A3

L1-A5

L1-A7

L1-A9

L1-A11

L1-A13

L1-A15

L1-A17

L1-A2

L1-A3

L1-A4

L1-A5

L1-A6

L1-A7

L1-A8

L1-A9

L1-A10

Empty space for moving fork Lifts

A2

R2

L1-A2

L1-A4

L1-A6

L1-A8

L1-A10

L1-A12

L1-A14

L1-A16

L1-A18

L1-A1

L1-A2

L1-A3

L1-A4

L1-A5

L1-A6

L1-A7

L1-A8

L1-A9

A3

R1

L1-A1

L1-A3

L1-A5

L1-A7

L1-A9

L1-A11

L1-A13

L1-A15

L1-A17

L1-A2

L1-A3

L1-A4

L1-A5

L1-A6

L1-A7

L1-A8

L1-A9

L1-A10

Empty space for moving fork Lifts


A3

R2

L1-A2

L1-A4

L1-A6

L1-A8

L1-A10

L1-A12

L1-A14

L1-A16

L1-A18

L1-A1

L1-A2

L1-A3

L1-A4

L1-A5

L1-A6

L1-A7

L1-A8

L1-A9


Wall of Warehouse

In the above structure, my client is storing the pallets in the sequence L1-A1, L1-A2, L1-A3, L1-A4

The first pallet will be going to location L1-A1, second will be L1-A2, third will be L1-A3 and forth will going to L1-A4.

In this while picking, my client wants to pick up the pallets in Last in First out or First in Last Out basis.

But SAP suggests it will be on the basis of Quant generation, so it will by L1-A1, L1-A2 and so on.

If anyone has worked on this kind of requirement or any idea of this, reply on the same.  


Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Feb 25, 2016 at 05:38 AM

    Hi Ajit,

    You can use "L" as the picking strategy for the storage type. For the two pallet depth, you can set the capacity of the bin to (2 X pallet fit qty). Pls check.

    Regards,

    Ravi

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 25, 2016 at 11:09 AM

    Hi

    As mentioned by Ravi, your requirement for picking should be fulfilled with LIFO (L) strategy.

    BR