SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Installation structure

Former Member
0 Kudos

hi

how this scenario can be worked out

full installation  of meter on 01/02/2016

full removal of meter on 01/02/2016

reversal of removal on 01/02/2016.

is it possible.

Message was edited by: William Eastman

1 ACCEPTED SOLUTION

daniel_mccollum
Active Contributor
0 Kudos

supplying activity date 01/02/2016 for removal should raise EN015

check the actual dates in egerh & eastl

likely the removal activity date is 02/02/2016 (this will show valid from / to as 01/02/2016 however)

reverse technical removal & do a billing install to revert to currently installed.

View solution in original post

2 REPLIES 2

daniel_mccollum
Active Contributor
0 Kudos

supplying activity date 01/02/2016 for removal should raise EN015

check the actual dates in egerh & eastl

likely the removal activity date is 02/02/2016 (this will show valid from / to as 01/02/2016 however)

reverse technical removal & do a billing install to revert to currently installed.

0 Kudos

thanks