hi

how this scenario can be worked out

full installation  of meter on 01/02/2016

full removal of meter on 01/02/2016

reversal of removal on 01/02/2016.

is it possible.

Message was edited by: William Eastman

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    Mar 16, 2016 at 09:09 PM

    supplying activity date 01/02/2016 for removal should raise EN015

    check the actual dates in egerh & eastl

    likely the removal activity date is 02/02/2016 (this will show valid from / to as 01/02/2016 however)

    reverse technical removal & do a billing install to revert to currently installed.