Bulk Update of Inspection lots in QM

Former Member
0 Kudos

Hi again everyone

I have been asked to update the "Insp. End Date" of a large number of Inspection lots as part of a project that is happening on-site.

I have done so through QA02 but I have been asked to do this twice already. However, I'm wondering if I'm asked again, is there a quicker way to update that field in a number of inspection lots at the same time.

I'm not sure if there is but you guys may have some tips on the most efficient way to do this.

Any tips would be greatly appreciated.

Thanks as always

Adrian

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Alternatively, you can use LSMW with QA02 recording.

busyaban7
Active Contributor
0 Kudos

Hi Adrian,

I can't remember any such transactions in SAP at this moment, apart form QA02, which may be helpful to you. You can try creating an eCATT script in SECATT for the field QALS-PAENDTERM and do the changes. As this is a very small change, I think eCATT option may be helpful though you can create separate programs, to do this change.

To get further insights about using eCATT in ECC 6.0, you can check below discussion thread -

catt in ECC 6.0 version | SCN

Thanks to all seniors for their comments in the thread!!

Thanks,

Arijit