Hi,
I am currently trying to build characteristic relationship for a plannable DSO.
Therefore I would like to use a second DSO (also plannable) to determine valid combinations.
Thus the system does not let me use a plannable DSO (transactional DSO not allowed) in my characteristic relationships.
I have seen this construct being accepted by a BW 7.40 system thus my customer used BW 7.30.
Any idea why the system does not allow me to use plannable DSOs in characteristic relationships?
Thanks,
Julian