Hi PM Guru,
In Order's operation, we can assign a personnel shown below.
In Order confirmation, we can confirm the hour with the actual personnel no.
If we retreive the personnel info in IW47, only the actual confirmation can be displayed if it is confirmed or else the planned personnel is displayed.
Is there a way to display both?
Thank you,
Sally