Dear All,

We are considering to use CPS for scheduling instead of using the standard condition technique scheduling in GATP.

The reason is that we have a requirement to set a 'departure calendar' in the scheduling.

Example: For certain customers we only want to ship out (make GI) on Wednesdays.

In the standard scheduling in GATP there is a user exit (EXIT_/SAPAPO/SAPLVCRM_002, field: ct_duras-TSTRID_DEP) to set the departure calendar.

But we are wondering if this could be solved without any user exit in CPS?

Anybody know how this should be setup in CPS?

Thanks for input,

Torsten

NB: We do not to make a workaround e.g. by setting load time to 1 sec and then enter a time stream calendar for the loading time in CPS. Because we do not want the GI to set according to the specific time zone that you would need to define in the time stream.