on 02-03-2016 11:37 AM
Dear experts,
Please could you explain how can we create multiple inspection lot for one production order ? It is possible ?
Thank you.
Regards
Hi,
Your question is not clear. at what stage you want multiple inspection lots for the production order??.
During production stage means when production process is ongoing or after the completion of production ???...
In standard SAP you can only generate one inspection lot during ongoing production. You need to activate inspection type 03 in material master. Inspection lot is created when you release the production order. this lot is called In-process inspection lot. for this same inspection lot you can do multiple results recording if you want. Check the below link for the same.
You need to activate inspection type 04 if you want inspection lot after the completion of production ...when you do GR against production order system will generate lots. here you can generate multiple lots for multiple GR for the same production order.
Hope this helps.
Thanks
Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Kumar for your reply.
But i think it's not the good approach for my requirement.
Otherwise, do you have any idea please how to send inspection request from SAP to external system ?
We have an integration with LIMS system and my requirement is to send a request to LIMS for an inspection ? What is the object to create inspection request in SAP ?
Thanks
Yes this is very well possible! But which inspection lot origin you want the lots should be created with? 03 or 04? As Jogeswara explains, you can set 03 and 04 inspection types in material master. As soon as the order is released it would trigger 03 type inspection lot and upon each goods receipt you would have 04 inspection type lots. Do multiple GRs and you would get multiple inspection lots. Do the setting mentioned in enclosed thread.
Note - You can have multiple inspection lots of 04 origin for the same order but you will always have only 1 lot for 03 origin for an order.
Anand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello yaz,
A solution is available in this discussion (by maintaining multiple Inspection types for Material): Multiple Inspection lots
Regards
KJogeswaraRao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.