Hello All,

I have an issue regarding Reorder point planning. PR is not generating if a open PO or PR is present. This PO is created manually with reference to PR. If i delete the old PO and PR only then new PR is generated after i run MRP in MD02

I have maintained following details

  • MRP type VB and lot size HB
  • ROP=45 PC,Maximum stock level = 200 PC and safety stock = 10 PC
  • Planned delivery time 10 days and availability check = 02
  • Delivery date of the PO is present inside the Planned delivery date of material master.

Desired Result: PR Qty = 160 qty

I have refereed many threads.but in this tread the correct out put is shown and i have followed the same things.

https://archive.sap.com/discussions/thread/3221011

Note:

I have attached screen shots for reference.

oppj-for-checking-rule-pp.jpg

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Jürgen L
Feb 06, 2017 at 12:11 PM
0

Reorder point 45

Stock on hand 40

open PO 10

new total 50, which is above ROP 45 and so you don't get a new requisition.

See also OSS note 1974398 - MD04: Available Qty lower than reorder point and safety stock