on 01-21-2016 4:38 PM
We are trying to get a percentage of the each row of the revised projection column using the sum of the Revised Project column. thoughts? I tried the obvious and it is not using the sum of the column. thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Did you try to do this in the BEx Query Designer?
Did you try the option Add Dynamic Calculation | Percentage Contribution in the Intial View in Design Studio (1.6)?
/Xavier
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.