Skip to Content

How can we change the motor with old one in sap pm?

Dear Guru's,

I have a motor that motor has less power (HP) and i changed the motor with high power (HP) so how can we do it and what is the process to change it.

Best Regards,

Atul

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    Posted on Jan 18, 2016 at 10:48 AM

    Also

    Dismantled motors will have systatus AVLB and installed motors will have INST or ASEQ. If you want to have non working spare motors also shown in your structure then you can have flocn with names Ready and Under Repair. When repairs of a motor completes it will be dismantled from there and installed under Ready flocn. And when a working motor changes a motor from Ready flocn will go to working flocn and the process continue.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2016 at 10:23 AM

    Hello Atul,

    It is exactly through class and characteristics. You need to maintain a class say motor in these two equipments and assign corresponding hp, amp, rpm, kw etc. After this you can do the equipment replacement by one another.

    Hope this is your query.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear,

      For old motor if you have PM checks, you need to deactivate the old motor Maintenance plan till you bring old motor live.And add this new high HP motor in PM plans also.

      If you have refurbishment process with serial number management you can use installation and dismanling process through IE4N transaction.

      Of no refurbishment , just like only creating maintennavce order aginst replacement , just go to IE02--> structure tab and click on dismantle, here system considers the validty end data of equipment as current date.

      Regards,

      pardhu

  • Posted on Jan 18, 2016 at 10:34 AM

    Dear,

    You can create new motor code for high power HP motor and install in functional location where old motor with less HP is installed.But here you need to have validity period fro New HP motor and Old HP motor.

    So valid from date for new HP motor needs to be assigned the date from which it is active.So that while you generate cost or equipment changed in a particular location list can be viewed in SAP.

    Normally we maintain one functional location as ELECTRICAL WORK SHOP shop so all the removed motors are relocated to electrical work shop f/l in sap.So taht you can have track ion the spare or removed equipments.

    Regards,

    pardhu

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2016 at 10:35 AM

    Hi Atul,

    This should be handled has a corrective order or Refurbishment process.

    Also as Jogeswara said, you should update the classification data.

    Regards

    Terence

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2016 at 11:27 AM

    Hello Atul,

    Here is how you close a discussion.

    • When you click on 'Correct answer' in any one of the received replies, you closed the discussion.
    • In case you felt, there was no Correct answer to your query and yet you want to close the discussion, then you click on 'Mark as assumed answered' below the title of your query. This too closes the discussion.
    • Also you may click on 'Helpful answer' for other replies found useful.

    Regards

    KJogeswaraRao

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2016 at 01:32 PM

    Atul,

    It seems you didn't get how to close a discussion. Go through this link: How to close a discussion and why

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.